HIGH SPEED TWO (HS2)

The HS2 Project in the UK represents a significant leap forward in the nation’s transportation infrastructure. The development of this high-speed rail network is advancing meticulously, showcasing impressive engineering and planning precision. This project aims to revolutionise travel by significantly decreasing journey times between major cities, thereby improving connectivity and stimulating economic growth throughout the region.

One standout aspect of the HS2 project is its implementation of innovative sustainable practices to minimise environmental impact. This includes the use of environmentally friendly materials and the integration of wildlife corridors and green spaces along the route, underscoring a strong dedication to sustainability. Furthermore, the construction process has created numerous job opportunities, contributing to economic prosperity and offering valuable skills training for construction workers.

Additionally, the HS2 Project sets a high standard for future infrastructure initiatives in terms of safety, efficiency, and community involvement. The collaborative efforts among stakeholders, local communities, and construction teams have fostered a culture of cooperation and mutual respect, ensuring the project benefits all parties involved. Overall, the HS2 Project is a prime example of successful large-scale infrastructure development, promising a more connected and prosperous future for the UK.

Zone Contractors Limited participates in both the Balfour Beatty VINCI Joint Venture (BBV) and the Eiffage, Kier, Ferrovial Construction, and BAM Nuttall Joint Venture’s (EKFB) sections. We provide our clients with a diverse team of experienced and qualified supervisory personnel and blue-collar workers to support the project by managing and executing essential construction tasks. Additionally, we have supplied several road sweepers and lorry loaders on a hire basis. Zone Contractors have also undertaken various initiatives to deliver social value to the communities impacted by the project, particularly in nearby towns and villages.

BBV is responsible for constructing sections N1 and N2 of the HS2 Project, covering approximately 90km. This involves numerous engineering feats, including 51 viaducts and boxes over 14km, 76 overbridges, 7.5km of twin tunnels, 35 cuttings totalling 30km, 76 culverts and other underbridges, 66 embankments spanning 33km, 4 motorway crossings requiring box structures, and 6 interfaces with existing rail necessitating dive-under and overbridge structures.

EKFB is tasked with sections C2 and C3 of the HS2 Project, running from Chiltern Tunnel to Long Itchington Wood. Their scope includes constructing 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges, and extensive excavations totalling around 30 million cubic meters. Zone Contractors provide experienced supervision, blue-collar labour, road sweepers, and lorry loaders to assist BBV, EKFB, and the Kier Group. Zone Contractors are also dedicated to delivering social value to the communities affected by the project.